A swimming pool under construction!

During the autumn of 2008 and the spring of 2009 there will be some construction activities going on in the garden of Villa Piolit. We are building a 10m by 5 m swimming pool, including its terrace and a technical room. The pool will, if we stick to the planning, be ready and available for our guests in June 2009.

We will put on a regular base new images on this page, so you can stay up to date on the building progress.


   
The side walls are being filled with concrete
[16/11/2008]
The side walls of the pool are covered with plastic foil
[16/11/2008]
   
The side walls of the pools placed
[15/11/2008]
View on the construction of the technical room
[20/10/2008]
   
The side elements are ready to be placed
[18/10/2008]
The stairs element of the pool is put into place
[16/10/2008]
   
The digging has finished
[16/10/2008]
Adjusting some details by hand
[13/10/2008]
   
Digging a big hole
[09/10/2008]
Adrie commanding the digging machine
[08/10/2008]
   
The shape of the pool is set
[08/10/2008]